Jump to content

garry55

Members
  • Posts

    36
  • Joined

  • Last visited

Posts posted by garry55

  1. got a call today to say the rear footrest mount modifications were complete, so off I trots to Malton to collect the frame. The rear footrest and silencer mount have been removed, saving at least 10kgs of weight, and the front footrest mount triangulated so............

    5afksj.jpg

    much neater - much lighter. 

    Back home in the garage, I fitted the front and rear ends then test-fitted a spare motor to see if all the newly attached engine mounts lined up................

    29qgz6a.jpg

    they did - perfectly :D Just the upper rear mounts to make now I can get the exact measurements for them.

    Left-side footrest mount.........
      
    317febp.jpg

    sits just right and well away from the rear shock line - result :D

    and the exhaust ports.............

    5jso74.jpg

    clear of the frame tubes - just as Suzuki designed them to be.

    • Like 5
  2. Had to wait until I had sourced a r/h front engine mounting plate before we could fit the other downtube.

    After much heating / bending / tweaking, here's the r/h frame tube tacked in place............

    bakxu.jpg

    Using the GT750 cradle enabled us to use the standard engine mounts too - and another bonus is that the radiator mounts are already in place.

    the rolling chassis with motor..........

    2r6e1y9.jpg

    final welding and dressing of  welds next............

    • Like 5
  3. we then pondered the best way to get the downtubes to clear the header pipes, without it looking too Heath-Robinson. This is what we came up with..........

    29m5fm0.jpg

    an early GT750 "J" frame off Eblag for £30, which we introduced to the trusty grinder..................

    2u5tcte.jpg

    then out with the old, and in with the new...........

    zl698y.jpg

    some heating and tweaking.........

    5tudqd.jpg

    and that fits nicely.......

    14kbj2f.jpg

    the down tube required the same attention........

    qpav.jpg

    and got it..........

    30uwrxd.jpg

    spot on (ish)..................

    2ur2dja.jpg

    tacked in place, awaiting final welding........

    2d2aogh.jpg

     

     

    • Like 3
  4. I'm thinking the really hard work is complete now. Fitting the GT750 motor into the 750 Katana frame has been a bit more difficult and involved than I had anticipated. Jigging the frame and motor to get the sprocket and swingarm centres aligned and the chain run spot on was straightforward enough..............................

    4se6ph.jpg

    2urrr7t.jpg

    getting the chain alignment right......

    2jg76ef.jpg

     but this off-set the motor so that the r/h exhaust port was fouled by the frame downtube. We sparked-up the grinder to make room for the header pipe.....

    2dw93xs.jpg

    2aalf8y.jpg

    118nb7r.jpg

    should fit now.........

    2eo9vo3.jpg

    npl8og.jpg

     

     

     

    • Like 6
×
×
  • Create New...