Jump to content

garry55

Members
  • Posts

    36
  • Joined

  • Last visited

Posts posted by garry55

  1. today I have been mostly fitting the Kettle air box - the tw*t put up a hell of a fight - had to remove the original Katana air box mounting bracket on the frame, the Kettle air box side cover mounting lugs and the inlet trunking on the rear of the air box to get it somewhere near. Then I had to beat some subtle dents into the air box upper rear to allow it it to clear the top frame tubes. Funny how an air box for a 3 cylinder 2-stroke is as wide as that for a 4 cylinder 4-stroke, but it's in at last.............

    15hzsjs.jpg
     
    although the air box mountings are far from central in the Katana frame..........

    2nlh56c.jpg

    tine for some more welding..........

  2. mounting the (Katana scooter!) 2T oil tank....

    33bkac9.jpg

    which is (mostly) hidden by the Katana's original electrics plate.....

    2chuu09.jpg

    on the left side. The right side required a bit more work.............

    using the rear air filter section of a Katana 1100 airbox which has been attacked by a rampant hacksaw.......

    2ccxoih.jpg

    and the bit I need, fitted in place, but yet to be cleaned-up - this will disguise the 2T oil tank on the r/h side of the bike.......

    2u3umjd.jpg

    244bllu.jpg

    ipayv5.jpg

    and help to retain the "standard Katana" look...........

  3. part of my "brief" for this project is to retain as many of the defining styling cues that made the original Katana's so different - and this includes keeping the instrument binnacle, usually replaced by Koso clocksets or the like.  So, having removed the internals from a (broken) set of Katana clocks, I set about fitting the Triumph speedo unit. Once mounted within the binnacle, it now required a new facia plate.

    11c9ll0.jpg

    to do this, you need the original facia plate and some Blue Tac.........

    33aux45.jpg

    a suitable material for the new facia (I used some Plasticard)......

    2j65sno.jpg

    a pen............

    dcwu21.jpg

    and a band saw helps too........

    f0vn76.jpg

    4nqdl.jpg

    re-attach template...........

    e0fm9j.jpg

    whiling filing away the night........

    x2qib8.jpg

    out with the compass cutter.........

    zkfwch.jpg

    just needs spraying and a couple of Katana decals and its done........

    dddte0.jpg

     

    • Like 6
  4. the bottom shock mounts..........

    22kz6s.jpg

    to be used to convert the mono-shocked TZR250 3MA swing arm to olde worlde twin shock spec.....

    33ys0tu.jpg

    So I set about locating the lower shock mounts onto the 3MA swing arm. The Gazi shocks that I purchased are 300mm between eye centres, adjustable to 310mm max. My ideal measurement is 330mm + adjustment, so the lower shock mounts would have to be moved nearer to the swing arm spindle.

    First, I drilled a piece of flat bar with a 10mm hole (lower shock mounting bolt size) and a 12mm hole (top mounting stud size) at 330mm centres, then attached it to the top mounting and jacked-up the swing arm until the lower bracket sat flush on the arm, like so..........

    2nlmy9.jpg

    I then sized and fitted the correct bushes for the shock mountings - Gazi shock sets include 4 of each of 3 different-sized bushings - 10mm, 12mm and 13mm.

    2r3jsp2.jpg

    with the swing arm still positioned at the 330mm height, I fitted the lower mountings to the shocks and attached them to the frame, thus.............

    23lxgea.jpg

    ensuring both lower mountings were sat flush on the swingarm, I took the measurement, both sides, from the trailing edge of the mounting to the end of the swingarm box section - exactly 141mm both sides - result  :D

    The swing arm was now ready for a trip to my welder.............

    • Like 2
  5. when I was looking for a Sprint ST speedo, to compliment the Sprint ST front end (and make the wiring-in simpler) it turned out cheaper to buy a whole instrument console - only £40 plus postage off everyone's favourite auction site..........


    33o2wyq.jpg

    included in the comprehensive display of instrumentation is this dinky electronic time piece.....

    28wdta9.jpg

    which I wanted to incorporate into the project - but where could I fit it without it looking like a cheap add-on..............?

    here of course - into one of the accessory ports thoughtfully provided by Suzuki.......

    30nkcxe.jpg

    a bit of measuring and drilling of 2 holes to accomodate the hour and minute adjustment buttons and......

    2lm8n6f.jpg

    it's in the r/h panel so at least I will be able to see it when the bike is at rest on it's sidestand  :D

     

    • Like 3
×
×
  • Create New...